Construction and Installation Services
From Design to Delivery Seamless Execution of Water and Wastewater Infrastructure

Delays, Downtime and Deviations are Not an Option

Installing a water or wastewater treatment plant is not just about building a structure; it is about integrating civil, mechanical, electrical and instrumentation systems with precision. Globally, over 65% of water infrastructure projects face overruns in schedule, budget and performance due to poor planning and fragmented execution (Source: McKinsey Global Institute). Whether it is an industrial wastewater treatment plant or a decentralized sewage treatment facility, suboptimal installation puts long-term compliance and ROI at risk.

WOG Technologies Limited eliminates this risk by delivering turnkey construction and installation services that are fast, safe and performance-assured. Our in-house experts and vetted partners ensure that every element, item of equipment, meter of piping, civil work and controls are built to last and are ready to perform.

What We Offer

Industries and Applications

Our construction and installation services are optimized for:

  • Industrial wastewater treatment plants
  • Municipal sewage treatment facilities
  • Zero liquid discharge systems
  • Seawater desalination units
  • Water recycling and reuse plants
  • Ultra-high purity water systems
  • Smart water treatment installations

Why WOG Technologies Limited?

End-to-end Accountability

We take full responsibility from groundbreaking to commissioning.

On-schedule Delivery

Proven methodologies and digital project tracking keep projects firmly and safely on time.

Multi-discipline Execution

Civil, mechanical, electrical and instrumentation teams under one roof.

Built for Longevity

We use top-grade materials and standardized construction practices to ensure that high lifecycle performance is executed.

Integration-ready

 All systems are prepared for SCADA, automation and digital twin if needed.

FAQs

Timelines vary by capacity and complexity. A modular industrial wastewater treatment plant can be installed in four to six months, while a large municipal facility may take nine to twelve months. Our project team provides a detailed execution schedule upon completion of the engineering phase.

Yes. We specialize in both greenfield and brownfield projects. For retrofits, we phase construction to avoid plant downtime and ensure that existing utilities remain functional during upgrades.

All sites operate under a zero-incident safety framework. Our teams are trained in OSHA protocols and site-specific HAZOP assessments are carried out before work begins.

We follow ISO 9001-aligned QA/QC protocols. Each work package is subject to inspection and testing, civil strength tests, weld inspections, cable meggering and loop checks before handover.

Yes. We frequently coordinate with client-nominated contractors. WOG provides the supervision, drawings and quality oversight needed to maintain standards and integration quality.

Build With Confidence

Speak to our construction and execution team today to discuss your upcoming project. From compact industrial systems to city-scale infrastructure, WOG ensures that your water and wastewater treatment plant is built right, the first time.

Explore Our Other Solutions

industrial-municipal-wastewater-treatment-plants-500x500
drinking-water-in-a-glass
seawater-reverse-osmosis-desalination
418-500x500
wastewater-treatment-process
Bulldozers-landfill
istock-1489735860
CGB-futures-in-Hong-Kong
tasks_spent_caustic_treatment
img_6576
chemical-dosing-system
shutterstock_1413617345-small
Waste-to-energy facility outside
Incineration-plant-Brescia-Italy
1605617165_glass_77249-491